[close]
test

Controlled Crack Joint Formwork Element

The secondary reinforcedcontrolled crack joint formwork element for the wall area serves for targeted crack formation along the crack introducer.
Crack formation as a result of weakening of the concrete cross-sections takes place due to the integrated separation layer at 1/3 of the component thickness/cross-section thickness.
The reinforcement overlap between the first and second concreting section is ensured by the installation of the formwork element between the lateral reinforcement layers.


Properties

Formwork element for concreting break