Controlled Crack Joint Formwork Element

The secondary reinforced controlled crack joint formwork element for floor/ceiling slabs serves for targeted crack formation along the crack introducer.
Crack formation as a result of weakening of the concrete cross-sections takes place due to the integrated separation layer at 1/3 of the component thickness/cross-section thickness.
The reinforcement overlap between the first and second concreting section is ensured by the installation of the formwork element between the upper and lower reinforcement layer.


Properties

Formwork element for concreting break